Grow load,not rates.WeaveGrid helps utilities grow load, not rates
WeaveGrid is the orchestration platform electric utilities use to welcome every new EV, home battery and smart thermostat onto the wires they already have. Location-aware, automatic, and built from the transformer up.
WeaveGridweaves everycharger, batteryandthermostat intoone living gridthat absorbsnew loadwithoutoverbuilding
Electric vehicles arrive one driveway at a time. That means new demand lands on specific transformers and specific feeders long before it shows up in a system-wide forecast. WeaveGrid gives utilities the software to absorb that growth reliably and affordably, on the grid they already have, instead of overbuilding infrastructure ahead of it.
The platform is a distributed energy resource management system (DERMS) for automated, location-aware dispatch of customer-owned devices behind the meter. It knows where each EV, battery and thermostat sits on your system, and it knows the limits of the equipment that serves it.
It works from the bottom up. Individualized signals go to each device, and charging and operating schedules adjust automatically to respect transformer, feeder and bulk-system limits at the same time.
WeaveGrid operates the largest distribution optimization programs in the United States for major investor-owned utilities and electric cooperatives. Letting load grow on existing infrastructure reduces the investment needed to serve new demand and puts downward pressure on electricity rates.
Vertical line marks each transformer’s limit. Charging is staggered to stay left of it.
Transformer level
Transformer-aware charging
The neighborhood transformer is where EV adoption is felt first. WeaveGrid sees the headroom on each one and staggers the charging of the vehicles behind it, so a street can welcome more EVs without a rushed equipment swap.
A good schedule has to work for the transformer, the feeder it hangs from and the bulk power system as a whole. Orchestration starts at the bottom and rolls up, so easing the system peak never overloads a single street.
Each schedule respects its own transformer, its feeder and the system peak.
Bottom-up dispatch
One signal per device
Instead of one blanket event for everyone, each EV, battery, thermostat and flexible load gets its own instructions, shaped by where it sits on the grid. Cars charge after the local peak, batteries discharge through it, thermostats pre-cool ahead of it.
Device data and grid data usually live in different systems. WeaveGrid combines them so both describe the same neighborhood, and your teams finally see what is happening at the grid edge.
What was dispatched, where, and which limits it protected. Planners, program managers and regulators read from the same record, from one transformer’s evening to a full season of peaks.
Major investor-owned utilities and electric cooperatives across the country run their programs on WeaveGrid. Whether your EV growth is concentrated in a few fast-moving suburbs or spread across rural members adding batteries and thermostats, the platform starts where your constraints actually are.
Drivers need a full battery by morning. They rarely need it at a quarter past six. Orchestration moves charging into the hours when the local transformer has room and clean generation is plentiful, without asking anyone to change how they live.
Unmanaged
Everyone plugs in at 6 PM
Transformer limit
4 PM8 PMMidnight4 AM
The same few hours carry every car’s charge, and the neighborhood transformer runs past its rating.
Orchestrated
Same energy, spread out
Transformer limit
4 PM8 PMMidnight4 AM
Individual schedules move charging later and flatter, so every car is ready and the equipment stays inside its limit.
Illustrative load profile for a single service transformer.